Building permit
Ha Lamed Heh 18
Ha Lamed Heh 18: 1 floor above the street, 1 home, occupied. Building permit 20200712, issued 6 December 2020.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Ramat HaHayal
Street: Ha Lamed Heh
- Stage
- Occupied
- Request type (the city's)
- בניה חדשה בניין דירה/קוטג'
- Floors above street level
- 1
- Homes
- 1
- Permit number
- 20200712
- Issued
- 6 December 2020
This building already stands; on the map it is among today's buildings.
Read from this sentence
בניית יחידת דיור חדשה- קוטג' בקיר משותף בת שתי קומות מעל מרתף
Check against the city's record
The city's record says 1 homes. The model read 1. They match.
The model's summary
A new two-storey semi-detached cottage over a basement replaces a one-storey home.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS