Building permit
Ben-Yehuda 59
Ben-Yehuda 59: addition under TAMA 38, 8 homes by the permit's text (11 in the city's record), under construction. Building permit 20210716, issued 27 March 2022.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 20 November 2026.
Neighbourhood: Old North, south part
Street: Ben-Yehuda
- Stage
- Under construction
- Request type (the city's)
- תוספות בניה תוספת בניה לפי תמ"א 38
- Homes
- 8
- Permit number
- 20210716
- Issued
- 27 March 2022
An addition to an existing building; the permit gives no total height.
Read from this sentence
כמות קומות לתוספת: 2, כמות יח"ד לתוספת: 8
Check against the city's record
The city's record says 11 homes. The model read 8. They differ.
The model's summary
Two floors and 8 new homes added on top of an existing apartment building under TAMA 38.
On this plot
- The building standing here in the city's record: 5 floors, drawn on the map at 3.6 m.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS