Building permit
Hahermon 28
Hahermon 28: 3 floors above the street, 1 home, under construction. Building permit 20211130, issued 3 April 2022.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Neve Tzedek
Street: Hahermon
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין מגורים לא גבוה (עד 13 מ'), בניה חדשה מרתפים
- Floors above street level
- 3
- Homes
- 1
- Permit number
- 20211130
- Issued
- 3 April 2022
Read from this sentence
כמות קומות מגורים: 3, כמות יח"ד מבוקשות: 1
Check against the city's record
The city's record says 1 homes. The model read 1. They match.
The model's summary
A new low residential building with 3 residential floors, one home, a basement and a rooftop pool.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS