Building permit
Rosh Pina 17
Rosh Pina 17, Eger 15: new building under TAMA 38, 6 floors above the street, 29 homes, at least one completion certificate. Building permit 20211162, issued 24 March 2022.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 20 November 2026.
Neighbourhood: Neve Sha'anan
Street: Rosh Pina
Street: Eger
- Stage
- At least one completion certificate
- Request type (the city's)
- בניה חדשה בניין מגורים גבוה (מעל 13 מ'), בניה חדשה בנייה חדשה תמ"א 38
- Floors above street level
- 6
- Homes
- 29
- Permit number
- 20211162
- Issued
- 24 March 2022
- Addresses on the plot
- Rosh Pina 17, Eger 15
This building already stands; on the map it is among today's buildings.
Read from this sentence
כמות קומות מגורים: 6, כמות יח"ד מבוקשות: 29
Check against the city's record
The city's record says 29 homes. The model read 29. They match.
The model's summary
Demolition and a new 6-floor residential building with 29 homes over shops, studio and one basement.
On this plot
- The building standing here in the city's record: 7 floors, drawn on the map at 25.2 m.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS