Building permit
Hacongress 9
Hacongress 9: 7 floors above the street, 22 homes, under construction. Building permit 20220947, issued 26 December 2022.
This is an independent project. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of the batch of 2 October 2026.
- Stage
- Under construction
- Floors above street level
- 7
- Homes
- 22
- Permit number
- 20220947
- Issued
- 26 December 2022
Read from this sentence
כמות קומות מגורים: 7, כמות יח"ד מבוקשות: 22
Check against the city's record
The city's record says 23 homes. The model read 22. They differ.
The model's summary
New residential building with 7 floors, 22 homes, a ground-floor shop and rooftop pool, built jointly with Congress 7.
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS