Building permit
Mivza Kadesh 69
Mivza Kadesh 69: 19 floors above the street, 69 homes, under construction. Building permit 20221392, issued 29 November 2022.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 20 November 2026.
Neighbourhood: Ne'ot Afeka A
Street: Mivza Kadesh
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין רב קומות (מעל 29 מ')
- Floors above street level
- 19
- Homes
- 69
- Permit number
- 20221392
- Issued
- 29 November 2022
Read from this sentence
כמות קומות מגורים: 19, כמות יח"ד מבוקשות: 69
Check against the city's record
The city's record says 69 homes. The model read 69. They match.
The model's summary
A new 19-storey residential tower with 69 apartments, underground parking and a double-height entrance lobby.
Relief requested
Asked for 20% extra building area to raise permitted units from 68 to 82; reasoning marked not relevant for the new permit.
On this plot
- The building standing here in the city's record: one floor, drawn on the map at 5.8 m.
- Covered by Plan מח/3312 · מתחם מבצע קדש: in force since 8 February 2010.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS