Building permit

Sheinkin Menahem 71

Sheinkin Menahem 71, Bilu 1: 5 floors above the street, 31 homes by the permit's text (13 in the city's record), under construction. Building permit 20221432, issued 3 January 2024.

Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer

What the municipal record shows, as of 20 November 2026.

Neighbourhood: Lev Tel Aviv

Street: Sheinkin Menahem

Street: Bilu

Stage
Under construction
Request type (the city's)
בניה חדשה מרתפים, תוספות בניה תוספות בניה שונות (כולל קומת קרקע), תוספות בניה תוספת מעלית חיצונית/פנימית, תוספות בניה פרגולה
Floors above street level
5
Homes
31
Permit number
20221432
Issued
3 January 2024
Addresses on the plot
Sheinkin Menahem 71, Bilu 1

Read from this sentence

כמות קומות מגורים: 5, כמות יח"ד מבוקשות: 31

Check against the city's record

The city's record says 13 homes. The model read 31. They differ.

The model's summary

Additions to an existing building with new basements, ground-floor housing, 5 residential floors and 31 apartments.

On this plot

Open on the map The permit's file in the city archive
How to open the file in the archive

It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.

Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS

https://tlvnext.com/p/20221432-en/