Building permit
Rothshild 101
Rothshild 101: 6 floors above the street, 11 homes, under construction. Building permit 20231006, issued 3 September 2023.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 20 November 2026.
Neighbourhood: Lev Tel Aviv
Street: Rothshild
- Stage
- Under construction
- Request type (the city's)
- תוספות בניה תוספות בניה שונות (כולל קומת קרקע)
- Floors above street level
- 6
- Homes
- 11
- Permit number
- 20231006
- Issued
- 3 September 2023
Read from this sentence
כמות קומות לתוספת: 3
Check against the city's record
The city's record says 11 homes. The model read 11. They match.
The model's summary
Three new residential floors with 11 homes added atop an existing 3-storey building, plus three basement levels.
On this plot
- The building standing here in the city's record: 3 floors, drawn on the map at 17.3 m.
- Covered by Plan 4320 · רובע 5, 6: deposited.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS