Building permit
Mekor Chayim 64
Mekor Chayim 64: 3 floors above the street, 6 homes by the permit's text (5 in the city's record), under construction. Building permit 20231109, issued 3 June 2024.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Shapira
Street: Mekor Chayim
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין מגורים לא גבוה (עד 13 מ')
- Floors above street level
- 3
- Homes
- 6
- Permit number
- 20231109
- Issued
- 3 June 2024
Read from this sentence
3 קומות מעל הקרקע (כולל קומת כניסה) + קומת גג חלקית, סה"כ 6 יח"ד
Check against the city's record
The city's record says 5 homes. The model read 6. They differ.
The model's summary
A new low-rise residential building with three floors plus a partial roof floor and six homes.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS