Building permit
Romanili 38
Romanili 38: 4 floors above the street, 3 homes, under construction. Building permit 20231279, issued 3 June 2024.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Neve Dan
Street: Romanili
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין מגורים לא גבוה (עד 13 מ'), תוספות בניה הריסה
- Floors above street level
- 4
- Homes
- 3
- Permit number
- 20231279
- Issued
- 3 June 2024
Read from this sentence
כמות קומות מגורים: 4, כמות יח"ד מבוקשות: 3
Check against the city's record
The city's record says 3 homes. The model read 3. They match.
The model's summary
A new residential building with four residential floors and three homes over a basement.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS