Building permit
Even Sapir 21
Even Sapir 21: 3 floors above the street, 2 homes, under construction. Building permit 20240069, issued 9 May 2024.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Neve Dan
Street: Even Sapir
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין דירה/קוטג'
- Floors above street level
- 3
- Homes
- 2
- Permit number
- 20240069
- Issued
- 9 May 2024
Read from this sentence
כמות קומות מגורים: 3, כמות יח"ד מבוקשות: 2
Check against the city's record
The city's record says 2 homes. The model read 2. They match.
The model's summary
A new residential building with an open ground floor, three residential floors, two homes, basement and pool.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS