Building permit

Allenby 77

Allenby 77, Mazeh 1: 6 floors above the street, 17 homes by the permit's text (16 in the city's record). Building permit 20240381, issued 18 March 2025.

Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer

What the municipal record shows, as of 20 November 2026.

Neighbourhood: Lev Tel Aviv

Street: Allenby

Street: Mazeh

Stage
Permit issued
Request type (the city's)
תוספות בניה תוספות בניה שונות (כולל קומת קרקע)
Floors above street level
6
Homes
17
Permit number
20240381
Issued
18 March 2025
Addresses on the plot
Allenby 77, Mazeh 1

Read from this sentence

כמות קומות לתוספת: 2

Check against the city's record

The city's record says 16 homes. The model read 17. They differ.

The model's summary

Addition of 2 floors and 17 apartments to an existing building, converting third-floor offices and rear ground-floor shops to housing.

Open on the map The permit's file in the city archive
How to open the file in the archive

It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.

Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS

https://tlvnext.com/p/20240381-en/