Building permit

Kehilat Warsha 68

Kehilat Warsha 68: 2 floors above the street, 2 homes, under construction. Building permit 20240767, issued 10 September 2024.

Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer

What the municipal record shows, as of 16 October 2026.

Neighbourhood: Hadar Yosef

Street: Kehilat Warsha

Stage
Under construction
Request type (the city's)
בניה חדשה בניין דירה/קוטג'
Floors above street level
2
Homes
2
Permit number
20240767
Issued
10 September 2024

Read from this sentence

כמות קומות מגורים: 2, כמות יח"ד מבוקשות: 2

Check against the city's record

The city's record says 2 homes. The model read 2. They match.

The model's summary

A new two-floor building with two homes, splitting ground-floor units and adding a rooftop level.

Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS

https://tlvnext.com/p/20240767-en/