Building permit
Kehilat Warsha 28
Kehilat Warsha 28: 2 floors above the street, 2 homes by the permit's text (1 in the city's record), under construction. Building permit 20241250, issued 11 November 2025.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Hadar Yosef
Street: Kehilat Warsha
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין דירה/קוטג'
- Floors above street level
- 2
- Homes
- 2
- Permit number
- 20241250
- Issued
- 11 November 2025
Read from this sentence
בן 2 קומות
Check against the city's record
The city's record says 1 homes. The model read 2. They differ.
The model's summary
Two new homes in a two-storey wing with a used roof space over a basement, replacing an existing flat.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS