Building permit
Kam 45
Kam 45: 3 floors above the street, 2 homes, under construction. Building permit 20241447, issued 11 November 2024.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 16 October 2026.
Neighbourhood: Ramat HaHayal
Street: Kam
- Stage
- Under construction
- Request type (the city's)
- בניה חדשה בניין דירה/קוטג'
- Floors above street level
- 3
- Homes
- 2
- Permit number
- 20241447
- Issued
- 11 November 2024
Read from this sentence
כמות קומות מגורים: 3, כמות יח"ד מבוקשות: 2
Check against the city's record
The city's record says 2 homes. The model read 2. They match.
The model's summary
A new residential building with three residential floors and two homes replaces a demolished one-storey building.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS