Building permit

Nehalot 11

Nehalot 11: 2 floors above the street, 2 homes, under construction. Building permit 20241919, issued 8 May 2025.

Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer

What the municipal record shows, as of 16 October 2026.

Neighbourhood: Neve Dan

Street: Nehalot

Stage
Under construction
Request type (the city's)
בניה חדשה בניין דירה/קוטג'
Floors above street level
2
Homes
2
Permit number
20241919
Issued
8 May 2025

Read from this sentence

כמות קומות מגורים: 2, כמות יח"ד מבוקשות: 2

Check against the city's record

The city's record says 2 homes. The model read 2. They match.

The model's summary

A new residential building with two residential floors, two homes and a basement replaces a demolished building.

Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS

https://tlvnext.com/p/20241919-en/