Building permit

Einstein 2C

Einstein 2C: 25 floors above the street, 212 homes, under construction. Building permit 20242305, issued 15 October 2024.

Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer

What the municipal record shows, as of 20 November 2026.

Neighbourhood: Tochnit Lamed

Street: Einstein

Street: Stern Isaac St

Street: Batya

Stage
Under construction
Request type (the city's)
בניה חדשה מגדל מגורים מעל 20 קומות
Floors above street level
25
Homes
212
Permit number
20242305
Issued
15 October 2024
Addresses on the plot
Einstein 2C, Einstein 2D, Stern Isaac St 8A, Batya 13, Batya 13A

Read from this sentence

סה"כ 25 קומות

Check against the city's record

The city's record says 212 homes. The model read 212. They match.

The model's summary

Two residential towers with 212 homes above 22 floors, plus commercial floors, shops, a restaurant and underground retail.

Open on the map The permit's file in the city archive
How to open the file in the archive

It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.

Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS

https://tlvnext.com/p/20242305-en/