Building permit
Barzilay 1
Barzilay 1, Mikve Yisrael 12: addition under TAMA 38, 6 floors above the street, 5 homes by the permit's text (3 in the city's record). Building permit 20260178, issued 15 November 2026.
Tel Aviv 2035 is an independent site. It is built on the city's open data, but it has no official connection to the municipality. It is not planning advice. For anything binding, go to the municipal engineering portal and the Planning Administration. Disclaimer
What the municipal record shows, as of 20 November 2026.
Neighbourhood: Lev Tel Aviv
Street: Barzilay
Street: Mikve Yisrael
- Stage
- Permit issued
- Request type (the city's)
- תוספות בניה תוספת בניה לפי תמ"א 38
- Floors above street level
- 6
- Homes
- 5
- Permit number
- 20260178
- Issued
- 15 November 2026
- Addresses on the plot
- Barzilay 1, Mikve Yisrael 12
Read from this sentence
כמות קומות לתוספת: 2.50
Check against the city's record
The city's record says 3 homes. The model read 5. They differ.
The model's summary
Adds 2.50 floors and 5 homes to an existing building under TAMA 38.
On this plot
- The building standing here in the city's record: 3 floors, drawn on the map at 17.6 m.
- Covered by Plan 4320 · רובע 5, 6: deposited.
How to open the file in the archive
It opens every document in the file; the developer's renderings are the ones marked "הדמיות". On a first visit the archive asks you to accept its terms, then goes blank: accept, then open this link again.
Buildings, permits, plans and aerial photos: Tel Aviv-Yafo Municipality open GIS